December 2023

Volume 06 Issue 12 December 2023
Social-Cultural Factors and Performance of Roads Construction Projects in Nairobi City County, Kenya
1Akuto Musaeh BP Kamarkor, 2Dr. Paul K. Sang (PhD), 3Dr. David Nzuki (PhD)
1Doctor of Philosophy in Business (Project Management) of Kenyatta University
2,3Department of Management Science, School of Business, Economics and Tourism, Kenyatta University
DOI : https://doi.org/10.47191/ijsshr/v6-i12-82

Google Scholar Download Pdf
ABSTRACT

The Kenyan Government is on the spot over stalled and poorly done roads construction projects especially in the Nairobi City County. Successful road construction is an impetus to economic development for Kenya as enumerated in the Kenya Vision 2030. However, there has been need for these road construction projects to update their systems due to the ever changing environment factors. Thisstudy therefore sought to determine the relationship between social-cultural factors and the performance of roads construction projectsin Nairobi City County, Kenya. The underpinning theory was the open system theory. Thisstudy used a positivist research philosophy. This study used the descriptive and explanatory research design. In this study, Nairobi City County refers to the five counties in the Nairobi Metropolitan Area namely, Nairobi County, Kiambu County, Kajiado County, Machakos County and Murang'a County. The target population of this research was the 176 completed roads construction projects in Nairobi City County by Kenya Rural Roads Authority (KERRA). The unit of observation was the road engineers, project planners and directors (KERRA), road supervisors, road inspectors, road surveyors, contractors, and project implementation teams’ members (KERRA). The unit of analysis wasthe completed roads construction projectsinNairobi City County. Proportional stratified sampling was used to derive a sample size of 253 respondents. A structured questionnaire was used to collect primary data. Data that was collected from the field was filtered, sorted and cleaned in line with research objectives. This study adopted both descriptive and inferential statistics. Descriptive statisticsincluding frequencies, percentages, mean scores, and standard deviation was produced for all the quantitative data. The results were presented using tables. Inferential statistics were done using the multiple linear regression. The study established a positive significant relationship between socio-cultural factors (t=2.417, p < 0.05) and project performance. The study concludes that human relationship influences project performance since projects operate within the society. Project culture is developed by communicating priority, status, and the alignment of official and operational rules. The study recommends that project leaders should be sensitive and aware of multicultural preferences guided by individual identity and role within the project versus family of origin and community, verbal and emotional expressiveness, relationship expectations, style of communication, language, personal priorities, values, and beliefs and time orientation.

KEYWORDS:

Social-cultural factors, Project performance, Human relationship, Project culture

REFERENCES
1) Adams, E. J., & Sherar, L. B. (2018). Community perceptions of the implementation and impact of an intervention to improve the neighbourhood physical environment to promote walking for transport: a qualitative study. BMC public health, 18(1), 1-14.

2) Afande, O. F. (2013). Factors Affecting Use of Donor Aid by International Non-Governmental Organizationsin Kenya: A Case of USAID. International Journal of Business Management and Administration, 1(3), 89 - 116.

3) Ahmed, M. (2021). Assessing the Performance of Public-Private Partnership Highway Projects: From Anecdotes to Comprehensive Evidence [Doctoral dissertation, Virginia Tech]. https://vtechworks.lib.vt.edu/handle/10919/104104

4) Ahmed, R., Mohamed, N.A. & Ahmed, M.S. (2014). Effect of Multidimensional Top Government policies on Project success: An Empirical Investigation. Retrieved from: https://www.researchgate.net/publication/269468314

5) An, H., Razzaq, A., Nawaz, A., Noman, S. M., & Khan, S. A. R. (2021). Nexus between green logistic operations and triple bottom line: evidence from infrastructure-led Chinese outward foreign direct investment in Belt and Road host countries. Environmental Science and Pollution Research, 28(37), 51022-51045.

6) Babaei, A., Locatelli, G., & Sainati, T. (2023). Local community engagement as a practice: an investigation of local community engagement issues and their impact on transport megaprojects' social value. International Journal of Managing Projects in Business, 16(3), 448-474.

7) Bertalanffy, L. V. (1968). General systems theory as integrating factor in contemporary science. Akten des XIV. Internationalen Kongressesfür Philosophie, 2(2), 335-340.

8) Von Bertalanffy, L. (1956). A biologist looks at human nature. The Scientific Monthly, 82(1), 33-41.

9) Buditiawan, K., Irawan, A. B., Setyawan, D., Rinawati, H. S., Yolarita, E., Khasanah Masbiran, V. U., & Dananjaya, I. (2022). Mitigation of social impacts of alternative road development plans based on local wisdom in West Sumatra, Indonesia. The Scientific World Journal, 2022.

10) Chaouk, M., Pagliari, R., & Moxon, R. (2020). The impact of national macro-environment exogenous variables on airport efficiency. Journal of Air Transport Management, 82(10), 17-40.

11) Chileshe, N., Njau, C. W., Kibichii, B. K., Macharia, L. N., & Kavishe, N. (2022). Critical success factors for Public Private Partnership (PPP) infrastructure and housing projectsinKenya. International Journal of Construction Management, 22(9), 1606-1617.

12) Creswell, J. W. & Clark, V. L. P. (2017). Designing and conducting mixed methodsresearch. New York: Sage publications.

13) Cytonn (2021). Nairobi Metropolitan Area (NMA) Infrastructure Report 2021. Retrieved at https://www.cytonn.com/topicals/nairobi-metropolitan-area-infrastructure-report

14) Elong, S., Muhwezi, L., & Acai, J. (2019). Assessment of the Challenges and Effects of Delays in Compulsory Land Acquisition on the Performance of RoadConstruction ProjectsinUganda. International Journal of Scientific & Engineering Research, 10(9), 1409- 1426.

15) Fernandes, T., Camerino, O., Garganta, J., Pereira, R., & Barreira, D. (2019). Design and validation of an observational instrument for defence in soccer based on the Dynamical Systems Theory. International Journal of Sports Science & Coaching, 14(2), 138-152.

16) Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., ... & van Wee, B. (2019). On De-Bunking'Fake News' in the Post-Truth Era: How to Reduce Statistical Error in Research. Transportation Research Part A: Policy and Practice, 126(3), 409-411.

17) Freeman, R. E. (1984). The politics of stakeholder theory: Some future directions. Business ethics quarterly, 3(1), 409-421.

18) Hambrick, D. C., & Mason, P. A. (1984). Upper echelons: The organization as a reflection of itstop managers. Academy of management review, 9(2), 193-206.

19) Kanyeria, R. N., & Karugu, J. (2020). Influence of External Business Environment on the Success of Health Projects in Nyandarua County, Kenya. International Journal of Business Management, Entrepreneurship and Innovation, 2(1), 1-16.

20) Kaplan, R. S., & Norton, D. P. (2015). Balanced Scorecard Success: The Kaplan-Norton Collection (4 Books). Boston: Harvard Business Review Press.

21) Kenya Roads Board (KRB). (2021). Annual Public Roads Programme (APRP) 2021/2022. Nairobi: KRB.

22) Kenya Rural Roads Authority (KeRRA) (2018). Nairobi-Region. Retrieved from https://www.kerra.go.ke/index.php/kerra regions/26-maintenance-region-tenders/259-nairobi09

23) Kenya Rural Roads Authority (KeRRA) (2021). Nairobi Region - 22% RMLF FY 2021-2022. Retrieved from https://kerra.go.ke/index.php/vision-2030-goals12/21-expired-tenders/1324-nairobi-region-22-rmlf-fy-2021-22

24) Kigera, P. M. (2016). Influence of Political Environment on Performance of International Hotel Chains Operating in Nairobi, Kenya [Doctoral dissertation, University of Nairobi]. http://erepository.uonbi.ac.ke/handle/11295/98571

25) Lu, J., Ren, L., Zhang, C., Liang, M., Abrhám, J., & Streimikis, J. (2020). Assessment of Corporate Social Responsibility performance and state promotion policies: a case study of The Baltic States. Journal of Business Economics and Management, 21(4), 1203-1224.

26) Mahmud, A. T., Ogunlana, S. O., & Hong, W. T. (2021). Key driving factors of cost overrun in highway infrastructure projectsin Nigeria: a context-based perspective. Journal of Engineering, Design and Technology, 19(6), 1530-1555.

27) Maina, C., & Gathenya, J. (2014). Influence of economic factors on performance of project management among petroleum marketing firmsin Kenya. International Journal of Academic Research in Business and Social Sciences, 4(6), 146-152.

28) Masovic, A. (2018). Socio-cultural factors and their impact on the performance of multinational companies. Ecoforum Journal, 7(1) 1-6.

29) Mobegi, J. O. E., James, R., & Sang, P. (2020). Social cultural attributes and Performance of Donor Funded Health Projects in Kenya. European Scientific Journal, 16(19), 558-578.

30) Moses, K. B. (2019). Micro and Macro Environments and Implementation of Public Private Partnership Infrastructure Development in Kenya [Doctoral dissertation, University of Embu]. http://41.89.240.73/handle/embuni/2204

31) Muriithi, W. Z., & Kiiru, D. (2021). Learning organization and performance of Kenya UrbanRoadsAuthority. International Academic Journal of Human Resource and Business Administration, 3(10), 29-45.

32) Musyoka, M. C., Gakuu, C., & Kyalo, D. N. (2017). Influence of Technological Environment on Performance of Gated Community Housing Projectsin Nairobi County, Kenya. European Scientific Journal, ESJ, 13(3), 11-43.

33) Mwangi, D. N. (2020). The Critical Role Of Participatory Approaches On Performance Of Major Infrastructure Projects: A Case of Selected Government (World Bank Funded) Projects in Nairobi, Kenya [Doctoral dissertation, United States International University-Africa]. https://erepo.usiu.ac.ke/handle/11732/6092

34) Odhiambo, S. D. (2021). Project Management and Implementation of Community-Based Projectsin Siaya County, Kenya [MBA Project, Kenyatta University]. https://ir-library.ku.ac.ke/handle/123456789/23658

35) Olawale, Y. A., & Sun, M. (2018). Cost and time control of construction projects: inhibiting factors andmitigating measures in practice. Construction management and economics, 28(5), 509-526.

36) Omondi, K., & Kinoti, K. (2020). Stakeholder participation and performance of road construction projectsin Kilifi County, Kenya. International Academic Journal of Information Sciences and Project Management, 3(6), 274-292.

37) Opawole, A., Jagboro, G. O., Kajimo-Shakantu, K., & Olojede, B. O. (2019). Critical performance factors of public sector organizationsin concession-based public-private partnership projects. Property Management, 37(1), 17-37.

38) Owuze, C. A. (2018). Original Paper an Analysis of the Socio-Cultural Environment and Performance Influences on Manufacturing Enterprisesin Nigeria. Research in Economics and Management, 3(4), 322-343.

39) Roth, S. (2019). The open theory and its enemy: Implicit moralisation as epistemological obstacle for general systemstheory. Systems Research and Behavioral Science, 36(3), 281-288.

40) Sabahi, S., & Parast, M. M. (2020). The impact of entrepreneurship orientation on project performance: A machine learning approach. International Journal of Production Economics, 226, 107-121.

41) San Santoso, D., & Gallage, P. G. M. P. (2019). Critical factors affecting the performance of large construction projectsin developing countries: A case study of Sri Lanka. Journal of Engineering, Design and Technology, 18(3), 531-556.

42) Scott, P. (2019). General system theory and the use of process mining to improve care pathways. Applied Interdisciplinary Theory in Health Informatics: A Knowledge Base for Practitioners, 263(11).

43) Van Assche, K., Verschraegen, G., Valentinov, V., & Gruezmacher, M. (2019). The social, the ecological, and the adaptive. Von Bertalanffy's general systems theory and the adaptive governance of social‐ecological systems. Systems Research and Behavioral Science, 36(3), 308-321.

44) Wambui, G. A., & Kisimbii, J. M. (2020). Social-Cultural DeterminantsInfluencing the Performance of Community Based Projectsin Kenya: A Case of Kilifi County. Journal of Entrepreneurship & Project management, 4(5), 17-34.

45) World Bank. (2017). World development report 2018: The changing nature of work. The World Bank.

46) Zhanglan, Y., Awino, Z. B., & Ogolla, K. (2019). Top management team, macro environment, managerial discretion and competitive advantage. International Academic Journal of Human Resource and Business Administration, 3(6), 282-298.
Volume 06 Issue 12 December 2023

Indexed In

Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar Avatar